— Where We Operate —

Active Projects

From exploration toward a mining-stage title in the Borgu gold belt

Flagship Exploration Licence EL68022 in Borgu LGA, Niger State — with a Small-Scale Mining Lease application filed over its highest-priority ground.

Portfolio at a Glance

1
Granted Mineral Title

Exploration Licence EL68022, Borgu LGA, Niger State — granted 13 October 2025.

66
Cadastral Units

13.2 km² of exploration ground under EL68022, in a proven gold belt with producing neighbours.

4
CU Under SSML Application

Mining-stage lease application filed over the highest-priority gold quadrant, carved from EL68022.

7+
Years Active

Incorporated 2018 (RC 1520962); under new ownership since October 2024.

— Flagship Project —

EL68022 — Borgu, Niger State

Licence
EL68022
Granted
13 October 2025
Location
Borgu LGA, Niger State
Cadastral Units
66 (4-CU priority quadrant under SSML application)
Area
13.2 km²
Commodity
Gold (primary), Lithium (secondary)
Status
Active — SSML application filed over priority quadrant; exploration continuing on remaining ground

Our flagship project. EL68022 sits in a proven gold belt surrounded by producing small-scale and large-scale operations. The site has confirmed gold-bearing surface mineralisation from historical artisanal workings, with multiple coarse-gold and nugget occurrences documented in soil and stream-sediment sampling.

Why This Project

  • Belt context: The Borgu/New Bussa corridor is surrounded by producing SSMLs and Mining Leases. Operating peer-group exists — this is not frontier greenfield.
  • Geology: Situated in the schist belt of the West African Craton margin. Multiple shear zones and structural targets identified from desktop and remote-sensing work.
  • Surface evidence: Visible gold in pan concentrates, nugget occurrences in soil profiles, and confirmed alluvial workings downstream of the licence.
  • Infrastructure: Accessible via the New Bussa–Wawa road corridor. Proximity to grid power (under review) and water (River Niger tributaries).
  • Commercial pathway: SSML application filed over the 4-CU priority quadrant — the route from exploration rights to a mining-stage title is underway. Technical reports available to qualified counterparties under NDA.

— The Ground, Visualised —

The Licence, As Granted

This is EL68022 as it exists at the Mining Cadastre Office — every line below is drawn from the coordinate schedule of the grant document, not an artist's impression.

Terrain relief of the EL68022 licence area near Kainji Lake, Borgu LGA, with the licence boundary outlined
Licence boundary over real terrain — Kainji Lake to the north-east, New Bussa corridor. Elevation data: NASA/USGS SRTM.
EL68022 — licence geometry per MCO grant The 66 cadastral units of Exploration Licence EL68022 drawn from the coordinate schedule of the Mining Cadastre Office grant, on the official 15-arcsecond cadastral grid. 4°30′15″E · 9°49′30″N 4°32′30″E · 9°53′00″N N 1 km EL68022 · 66 CU · 13.2 km² · BORGU, NIGER STATE

Geometry from the MCO grant coordinate schedule (15″ cadastral grid). The 4-CU SSML application quadrant sits within this licence; its exact cells will be published if and when the lease is granted.

Systematic surface work across all 66 units identified one standout gold quadrant — those 4 units are now under a Small-Scale Mining Lease application, and exploration continues across the remaining ground.

— Mining-Stage Application —

SSML Application — Borgu Priority Quadrant

Title Type
Small-Scale Mining Lease
Location
Within EL68022, Borgu LGA, Niger State
Cadastral Units
4 (~0.85 km²)
Commodity
Gold
Status
Application submitted — awaiting grant

The application covers EL68022's highest-priority gold quadrant, selected from systematic surface work across the licence. Filing for a mining-stage title on our own ground is a deliberate commitment: the target was good enough to stake the next stage on. Grant status will be updated here once the Mining Cadastre Office decides.

Pipeline: Ondo State

Reconnaissance surveys over target areas in Ondo State were completed in late 2025, with geologist field reports and budgeted, closed-out field missions. Target assessment is ongoing; new titles will be announced here if and when granted.

We list only titles we hold and work we have actually done. Licence numbers and grant documents are verifiable at the Nigerian Mining Cadastre Office and are shared with qualified counterparties under NDA.

Terrain relief of the Ondo State reconnaissance region
Ondo State terrain (SRTM). Specific target areas are deliberately not published.

Partnership Models

We engage with capital, technical partners, and strategic investors in three principal structures. Specifics are confidential and developed against the counterparty's mandate and the project's stage.

Joint Venture

OMM contributes the licence(s), partner contributes capital and operating capability. Standard mining-industry JV structure with operator appointment, governance, and exit clauses.

Royalty / Streaming

Counterparty funds exploration in exchange for a Net Smelter Return (NSR) or gross-revenue stream on production. OMM retains title and operational involvement; partner earns a passive return.

Outright Sale

For counterparties who want full control and are prepared to pay a premium for the licence package, ongoing disclosure obligations, and our exit from the licence area.

Request the Technical Pack

Site maps, soil-sample data summaries, structural interpretations, and the SSML application pack are available to qualified counterparties under NDA.